Home > SHIGA 滋賀県 > Otsu 大津市 > Katata and Ukimido Floating Temple 堅田・浮御堂
With twin two-lane bridges, the 1.4-km north bridge (Katata to Moriyama traffic) was completed in 1994. The south bridge (1.35 km) was the original bridge completed in 1964 (for for Moriyama to Katata traffic).
Keywords: shiga otsu katata lake biwa biwako ohashi bridge kosei

With twin two-lane bridges, the 1.4-km north bridge (Katata to Moriyama traffic) was completed in 1994. The south bridge (1.35 km) was the original bridge completed in 1964 (for for Moriyama to Katata traffic).

031-IMG_3918.jpg 134-IMG_1405.jpg 190-IMG_3431.jpg ka111-IMG_7610.jpg ms027-20081017_2160.jpg ms083-20081017_2622.jpg ms121-20081017_2788.jpg

Add your comment
Anonymous comments are not allowed here. Log in to post your comment