Home > SHIGA 滋賀県 > Otsu 大津市 > Katata and Ukimido Floating Temple 堅田・浮御堂
With twin two-lane bridges, the 1.4-km north bridge (Katata to Moriyama traffic) was completed in 1994. The south bridge (1.35 km) was the original bridge completed in 1964 (for for Moriyama to Katata traffic).
Keywords: shiga otsu katata lake biwa biwako ohashi bridge kosei

With twin two-lane bridges, the 1.4-km north bridge (Katata to Moriyama traffic) was completed in 1994. The south bridge (1.35 km) was the original bridge completed in 1964 (for for Moriyama to Katata traffic).

su206-20030905-111_1116.jpg ci453-IMG_1342.jpg 190-IMG_3431.jpg ka111-IMG_7610.jpg sg060-20081013_1748.jpg sg125-IMG_2590.jpg sg130-20081013_1838.jpg

Add your comment
Anonymous comments are not allowed here. Log in to post your comment