Picture has been added to favorites
Home > SHIGA 滋賀県 > Otsu 大津市 > Katata and Ukimido Floating Temple 堅田・浮御堂
With twin two-lane bridges, the 1.4-km north bridge (Katata to Moriyama traffic) was completed in 1994. The south bridge (1.35 km) was the original bridge completed in 1964 (for for Moriyama to Katata traffic).
Keywords: shiga otsu katata lake biwa biwako ohashi bridge kosei

With twin two-lane bridges, the 1.4-km north bridge (Katata to Moriyama traffic) was completed in 1994. The south bridge (1.35 km) was the original bridge completed in 1964 (for for Moriyama to Katata traffic).

b064-IMG_2162.jpg ka111-IMG_7610.jpg om018-20081011_0671.jpg a201-20090409_8394.jpg hi014-IMG_6596.jpg on120-20081012_1434.jpg a147-IMG_3607.jpg

Add your comment
Anonymous comments are not allowed here. Log in to post your comment