Home > SHIGA 滋賀県 > Otsu 大津市 > Katata and Ukimido Floating Temple 堅田・浮御堂
With twin two-lane bridges, the 1.4-km north bridge (Katata to Moriyama traffic) was completed in 1994. The south bridge (1.35 km) was the original bridge completed in 1964 (for for Moriyama to Katata traffic).
Keywords: shiga otsu katata lake biwa biwako ohashi bridge kosei

With twin two-lane bridges, the 1.4-km north bridge (Katata to Moriyama traffic) was completed in 1994. The south bridge (1.35 km) was the original bridge completed in 1964 (for for Moriyama to Katata traffic).

cl014-IMG_01115.jpg ho051-IMG_00964.jpg rd031-IMG_01719.jpg ka111-IMG_7610.jpg sj164-IMG_3005.jpg kh102-web_080528-n-6984m-019.jpg yk047-20080925_0491.jpg

Add your comment
Anonymous comments are not allowed here. Log in to post your comment