Home > SHIGA 滋賀県 > Otsu 大津市 > Katata and Ukimido Floating Temple 堅田・浮御堂
With twin two-lane bridges, the 1.4-km north bridge (Katata to Moriyama traffic) was completed in 1994. The south bridge (1.35 km) was the original bridge completed in 1964 (for for Moriyama to Katata traffic).
Keywords: shiga otsu katata lake biwa biwako ohashi bridge kosei

With twin two-lane bridges, the 1.4-km north bridge (Katata to Moriyama traffic) was completed in 1994. The south bridge (1.35 km) was the original bridge completed in 1964 (for for Moriyama to Katata traffic).

um226-20100818_9559.jpg mi100-20100818_9487.jpg ka111-IMG_7610.jpg ot137n-20170324_6637.jpg hi014-IMG_6596.jpg on120-20081012_1434.jpg sk059-20090412_0587.jpg

Add your comment
Anonymous comments are not allowed here. Log in to post your comment